Get your compressor back online. Faster than the OEM.
From bearing swaps to full rotor rebuilds — workshop or on-site. Every job is documented, balanced, and signed off by a senior compressor engineer.
Problems you might be facing
Compressor tripped — production is stopped
Emergency breakdown with no diagnosis. Your team doesn't have the centrifugal compressor expertise to troubleshoot.
OEM service team is weeks away
The OEM's nearest engineer is overseas. You need someone on-site this week, not next month.
Repair costs spiraling out of control
Without a clear root-cause diagnosis, you keep replacing parts that fail again within months.
Capabilities
Mechanical overhaul
Strip, inspect, refurbish, reassemble — to OEM clearances or better.
Vibration analysis
Field balancing, modal analysis, spectrum diagnosis on bearings & gears.
Performance test
ASME PTC-10 style aero test on finished overhauls (where bench permits).
Bearings & seals
Re-Babbitt, dry gas seal exchange, mechanical seal recondition.
On-site service
Field-service teams for emergency callouts across India and the region.
Full documentation
As-found / as-left reports, photos, NDT records, and torque sheets.
Why customers choose us
- ISO-aligned repair documentation included with every overhaul.
- Rotor balancing in-house to API 617 grade.
- Optional Industry 4.0 retrofit during major overhauls (often pays back the engagement).
Process
Assess
On-site survey — vibration, thermals, performance baseline.
Strip & inspect
Disassembly, NDT, dimensional inspection, root-cause analysis.
Repair
Component-level refurb or reverse-engineered replacement parts.
Reassemble & test
Balanced rotor, alignment, performance test, sign-off package.
Frequently asked questions
Can you handle emergency breakdowns?+
Yes. Tier-1 service contracts include 24/7 hotline access and a 48-hour callout commitment for India sites.
Do you support compressors older than 30 years?+
Routinely. We've kept 1980s-vintage Centac, MSG and Atlas Copco machines running by combining repair with selective controls and seal upgrades.
What if parts are obsolete?+
Our reverse engineering team takes over — typical 6–10 weeks for impellers, 2–4 weeks for coolers and bearings.
