Turbo Airtech
Products · Control Systems

Modern controls for compressors of any vintage.

Replace obsolete Quad, Maestro, and Series 7 panels with modern PLC/SCADA systems — or get exact-replacement panels when you need to keep the original platform. Remote monitoring and predictive alerts included.

Modern controls for compressors of any vintage.
Sound familiar?

Problems you might be facing

Legacy panel failures with no spare parts

Your 20-year-old control panel fails and the OEM says the board is discontinued. No path forward.

Zero visibility into compressor health

No remote monitoring, no trend data, no alerts — you find out about problems when the machine trips.

OEM quotes full system replacement

The OEM wants to replace the entire compressor when all you need is a modern controller on the existing machine.

What's included

Capabilities

PLC control panels

Allen-Bradley, Siemens, and Schneider PLC panels pre-programmed for centrifugal compressor control logic.

HMI touchscreens

10″ to 21″ industrial touchscreen panels with custom compressor graphics, trend screens, and alarm management.

Remote monitoring

Ethernet/IP, Modbus TCP, and OPC-UA connectivity for SCADA integration and cloud-based monitoring.

Legacy panel replacements

Exact-fit replacement boards and panels for Quad, Maestro, and Series 7 platforms.

Instrument packages

Pressure, temperature, vibration, and flow transmitters matched to your compressor configuration.

Full documentation

Electrical drawings, I/O lists, PLC programs, and commissioning procedures delivered with every panel.

Why customers choose us

  • Drop-in retrofit kits for Cameron, Ingersoll Rand, Atlas Copco, and Centac compressors.
  • Predictive maintenance ready — vibration trending, bearing temperature tracking, surge detection.
  • All panels factory-tested with simulated I/O before shipping.
  • On-site commissioning and operator training available.
  • 24/7 remote support included for the first year.

Frequently asked questions

Can you retrofit controls on a compressor from the 1980s?+

Yes. We've retrofitted machines dating back to 1978 with modern PLC controls. The existing motor, gearbox, and compressor stay — only the control panel and instruments change.

Do you support DCS integration?+

Yes. We provide hardwired and communication-based interfaces to all major DCS platforms (Honeywell, Yokogawa, ABB, Emerson) with protocol conversion as needed.

What if my old Quad panel just needs a spare board?+

We stock and repair Quad, Maestro, and Series 7 boards. If the board is truly obsolete, we can replace just the controller while keeping the existing I/O wiring.

How long does a controls retrofit take?+

Panel build is 8–12 weeks. On-site installation and commissioning typically requires 3–5 days during a planned shutdown.

Ready to get started?

Get a no-obligation technical assessment within 48 hours.